Showing 257 works matching selected filters.
THE BOROUGH OF BLACKPOOL (George Street) (TEMPORARY PROHIBITION OF TRAFFIC) ORDER 2026
THE BOROUGH OF BLACKPOOL (Alleyway between Milbourne Street and Charles Street) (TEMPORARY PROHIBITION OF TRAFFIC) ORDER 2026
Road closure on BLackleach Lane, Woodplumpton at Bridge 31, near its junction with Catforth Road. Works carried out by Core Highways.
footpath closure and Prow closure
Medium Pressure Gas mains replacement works, Abandon 12" ST gas main, lay new 250mm MP PE main via dead insert method
IMMEDIATE WORKS open cut excavation required to repack leaking valve in the carriageway
Excavate to replace existing water main with new main as part of United Utilities mains replacement program - OPEN CUT
Excavation works to find and repair a fault on an existing Low Voltage (LV) mains or service cable. The work will include digging to locate the cable, testing it, identifying the fault, repairing or replacing the cable/joint, and carrying out final testing. Once the work is complete, the excavation will be backfilled and the area reinstated.
Excavate to replace existing water main with new main as part of United Utilities mains replacement program - OPEN CUT
Reconstruction of Road due to subsidence, will need to dig out the road and reconstruct from base level upwards.
1 x standalone Ped crossings with carriageway incursion
gang to rectify defective reinstatement in the footway and c/way (6mm & HRA)
NWGA270172 - Replace 410m gas main with associated services and connections
IMMEDIATE WORKS open cut excavation is required to repair leaking stop tap in the footway
lay 3m ducting in f/w
IMMEDIATE WORKS REQUIRED TO REPAIR SEWER IN THE FOOTWAY.FOLLOWED BY A PERMANENT REINSTATEMENT
GARSTANG V26156 - PON Gigabit 1451679 - To build new joint box and lay approx 75m of Duct 54/56 in
IMMEDIATE WORKS open cut excavation is required to repair leaking service in the footway
Gas mains connection
IMMEDIATE WORKS open cut excavation is required to repair leaking valve in the verge
clear blockage in f/w
Carriageway pre-surface dressing patching works.
446m track, tobys, 6 road crossings, 5 chambers, install cabinet
GARSTANG V27017 - PON Gigabit 1453107 - To build new 2 x JUF2 joint box and lay approx 215m of Duct 54/56 in
Excavation works to find and repair a fault on an existing Low Voltage (LV) mains or service cable. The work will include digging to locate the cable, testing it, identifying the fault, repairing or replacing the cable/joint, and carrying out final testing. Once the work is complete, the excavation will be backfilled and the area reinstated.
NWGA270163 - Connection notice in relation to works on Preston Street
279m Track, tobys, 5 road crossings, 14 chambers
Excavate joint bay in the footway to install and joint cable for new connection to car charging point located on private land.
Gas mains connection
Excavation for new service. 3 x chapter 8, walkway required with ramps, road is 8.5m wide so traffic flow maintained,
GARSTANG V26156 - PON Gigabit 1451679 - Overlay â Lay approx 98m of Duct 54/56 in to link existing BT Boxes to facilitate spine cabling works.
GARSTANG V27017 - PON Gigabit 1453107 - Overlay â Lay approx 200m of Duct 54/56 in to link existing BT Boxes to facilitate spine cabling works.
Renew / Raise / Lower frame and cover on joint box in CW.
Private Works issued under Section 50 Licence, carried out by Aptus Utilities. Excavating and installing HV.
NWGA261383 - Replace 140m gas main with associated services and connections as directed by HSE to maintain a safe gas network
065-05 - Water mains replacement works - Excavate to replace existing water main with new main as part of United Utilities mains replacement program
Private Works issued under Section 50 Licence, carried out by Aptus Utilities. Excavating and installing HV.
Install external water meter and boundary box at depth of under 1.5 meters with d minimum ig.
NWGA270172 - Replace 940m gas main with associated services and connections as directed by the HSE to maintain a safe gas network
NWGA261383 - Replace 60m gas main with associated services and connections as directed by the HSE to maintain a safe gas network
106m track, tobys, 2 chamber
Lot 5 - Large 100mm diameter meter installation including chamber and by pass. Chamber installation will be conducted in footway and by pipe work in carriageway
IMMEDIATE WORKS open cut excavation is required to repair leaking service in the footway
153m track, tobys, 3 road crossings, 1 chamber
89m track, tobys, 1 road crossing, 2 chambers
NWGA270163 - Replace 745m gas main with associated services and connections
307m track, tobys, 2 road crossings, 4 chambers
Private Works issued under Section 50 Licence, carried out by Aptus Utilities. Excavating and installing water.
Large diameter gas mains replacement work excavation for connection pit ICW works going through the park
Excavation in the footway and/or carriageway to replace existing electrical apparatus, and associated cables. Works involve removal of aged or damaged equipment, installation of new units, cable jointing, and testing. Once complete, the works will be backfilled & reinstated.
Carriageway drainage repairs
Excavation works to find and repair a fault on an existing Low Voltage (LV) mains or service cable. The work will include digging to locate the cable, testing it, identifying the fault, repairing or replacing the cable/joint, and carrying out final testing. Once the work is complete, the excavation will be backfilled and the area reinstated.
IMMEDIATE WORKS open cut excavation is required to repair leaking main in the footway
Mains renewal of existing poor condition main
NWGA261383 - Replace 340m gas main with associated services and connections as directed by the HSE to maintain a safe gas network
Water mains renewal - approx. 300m sliplining.
Investigate and replace if necessary governor outlet
GARSTANG V26156 - PON Gigabit 1451679 - To build new joint box and lay approx 24m of Duct 54/56 in
IMMEDIATE WORKS TO PREVENT UNPLANNED INTERRUPTION OF SUPPLY PROVIDED BY UNITED UTILITIES - OPEN CUT EXCAVATION REQUIRED TO REPAIR LEAK ON WATER MAIN AT DEPTH OF UNDER 1.5 METRES BY HAND DIG IN FOOTWAY
NWGA270172 - Connection notice in relation to works on Liverpool Road
NWGA270172 - Replace 940m gas main with associated services and connections as directed by the HSE to maintain a safe gas network
Replace approx. 210m of gas mains replacement & associated services
Gas mains diversion works - Abandon 180mm PE main Lay new 180PE main via open cut method
MAKE SAFE A DANGEROUS VOID IN THE FOOTWAY/Carriageway - TO BE FOLLOWED BY FURTHER WORKS TO REPAIR THE DEFECTIVE SEWER
Excavation in the footway and/or carriageway to replace existing electrical apparatus, and associated cables. Works involve removal of aged or damaged equipment, installation of new units, cable jointing, and testing. Once complete, the works will be backfilled & reinstated.
Water mains renewal - approx. 300m sliplining.
IMMEDIATE WORKS TO PREVENT UNPLANNED INTERRUPTION OF SUPPLY PROVIDED BY UNITED UTILITIES - OPEN CUT EXCAVATION REQUIRED TO REPAIR LEAK ON WATER SERVICE AT DEPTH OF UNDER 1.5 METRES BY HAND DIG IN FOOTWAY
Private Works issued under Section 50 Licence, carried out by Aptus Utilities. Excavating and installing water.
GARSTANG V26156 - PON Gigabit 1451679 - To build new joint box and lay approx 6m of Duct 54/56 in
IMMEDIATE WORKS open cut excavation is required to repair leaking service in the carriageway
Private Works issued under Section 50 Licence, carried out by United Utilities for Excavate and install mains for HV supply
Private Works issued under Section 50 Licence, carried out by Applethwaite Homes for Excavating and installing LV
Private Works issued under Road Space Allocation Licence, carried out by Brimas Construction
IMMEDIATE WORKS TO PREVENT UNPLANNED INTERRUPTION OF SUPPLY PROVIDED BY UNITED UTILITIES - OPEN CUT EXCAVATION REQUIRED TO REPACK LEAK ON WATER VALVE AT DEPTH OF UNDER 1.5 METRES BY HAND DIG IN FOOTWAY
Trace then excavate to repair gas escape and reinstate where possible
Private Works issued under Section 50 Licence, carried out by Aptus Utilities. Works to excavate and install LV mains.
Replace approx. 208m of gas mains & associated services
Private Works issued under Section 50 Licence, carried out by Aptus Utilities. Excavating and installing Gas
Essential dig in telecoms network to expose and lay duct for new service connection
GARSTANG V26156 - PON Gigabit 1451679 - To build new joint box and lay approx 3m of Duct 54/56 in
Enabling new localised ultra-fast broadband connections. This activity involves excavation to install telecoms duct to provide service and reinstatement.
Excavate in footway for new service connection and disconnection, footpath closure with alternate route, team to park in front of works, grab to service works under give and take.
Excavate joint bay in the footway to install and joint cable for new connection to car charging point located on private land.
GARSTANG V26012 - PON Gigabit 1448903 - Overlay â Lay approx 70m of Duct 54/56 in to link existing BT Boxes to facilitate spine cabling works.
IMMEDIATE WORKS open cut excavation is required to repair leaking main in the carriageway
NO GAS
Investigate and replace if necessary governor outlet
12M duct required in Footway / Carriageway to connect customer to existing BT Network
Private Works issued under Section 278 Licence, carried out by Quinn Civils. Highway Improvement Works incorporating Drainage, Street Lighting Improvements and Traffic Signal Upgrades
Private Works issued under Section 50 Licence, carried out by Aptus Utilities. Excavating and installing gas.
Install 1x 110mm PE New Branch Connection to the 4" CI Main & Install NAV & Bulk Meter
Private Works issued under Section 278 Licence, carried out by Quinn Civils. Highway Improvement Works incorporating Drainage, Street Lighting Improvements and Traffic Signal Upgrades
Excavation in the footway and/or carriageway to replace existing electrical apparatus, and associated cables. Works involve removal of aged or damaged equipment, installation of new units, cable jointing, and testing. Once complete, the works will be backfilled & reinstated.
Excavation on Medium Pressure gas valve to install pressure points for contingency in operation on Blackpool Road
Private works under 278 licence to allow Stainforth Construction LLP to install new belmouth entrance for retail store. Works include carriageway widening, filter land and island.
Install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
Minor remedial works
install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
Gas mains reinforcement works -Lay new 250mm LP PE main via open cut method to reinforce gas supply to the local area
INSTALL 2 NEW BT TELEGRAPH POLE
No Dig permit to Weld 355mm Main in carriageway.
Private Works issued under Section 278 Licence, carried out by AJ Cornall. Planing off and surfacing works to take place.
Install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
GARSTANG V26012 - PON Gigabit 1448903 - Overlay â Lay approx 150m of Duct 54/56 in to link existing BT Boxes to facilitate spine cabling works.
clear blocked
1X Long sided disconnection of old lead supply and replace with new water connection
Minor Remedial Works
Minor Remedial works
laying 10m ducting in f/w
GANG TO DIG DOWN AND REPAIR SEWER IN CARRIAGEWAY TO PREVENT FOUL FLOODING WITH PERMANENT REINSTATEMENT
Replace approx. 170m of gas mains & associated services
GANG TO CARRY OUT LINING WORKS TO SEWER IN FOOTWAY ON BEHALF OF UNITED UTILITIES
Replace approx. 900m of gas mains, connections and associated services
lay 1m ducting in f/w then 6m in private
Install external water meter and boundary box at depth of under 1.5 meters with d minimum ig.
NVT - To install a new service point in the existing Virgin Media network for a new customer connection.
Gas mains reinforcement work- Lay new 250mm LP pe gas main via open cut method to reinforce gas supply to the locale area
Minor remedial works
cway channel sweep and verge grass cutting
Private Works issued under Section 278 Licence, carried out by AJ Cornall. Works to excavate a pit for UU connection point.
Install external water meter and boundary box at depth of under 1.5 meters with minimum dig
Remedial works to complete in the carriageway to rectify internal defect
PERMIT FOR TM PURPOSES ONLY - MAIN WORK TO SEWER IS ON MOOR LANE
HAMBLETON V9009 - PON Gigabit 1420656 - Cable jointing and splicing to complete BT Spine works in Footway/Carriageway/Verge
Open cut excavation required to replace leaking stop tap in the footway
Overlay â Lay approx 1m of duct in FW to link existing BT boxes to facilitate spine cabling works.
Install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
ROUTINE MAINTENANCE OF SEWER NETWORK ON BEHALF OF UNITED UTILITIES
cway channel sweep and verge grass cutting
Minor remedial works
Minor remedial works
Minor remedial works
Minor remedial works
clear blockage in f/w
Install external water meter and boundary box at depth of under 1.5 meters with d minimum ig.
ROUTINE MAINTENANCE OF SEWER NETWORK ON BEHALF OF UNITED UTILITIES
MJ QUINN ARE TO RECOVER REDUNDANT HEAVY TELECOMS CABLE FROM EXISITING CHAMBERS - NO EXCAVATION - ROLLING TM
NWGA261383 - Replace 260m gas main with associated services and connections as directed by the HSE to maintain a safe gas network
Minor remedial works
Open cut excavation required to replace leaking stop tap in the footway
Minor Remedial Works
Install external water meter and boundary box at depth of under 1.5 meters with d minimum ig.
lay 1m ducting in f/w then 13m in private
Minor remedial works
install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
Minor remedial works
Renew / Raise / Lower frame and cover on joint box in FW.
450m track, tobys, 4 road crossings
GARSTANG V26156 - PON Gigabit 1451679 - To build new joint box and lay approx 17.25m of Duct 54/56 in
GARSTANG V26012 - PON Gigabit 1448903 - Overlay â Lay approx 35m of Duct 54/56 in to link existing BT Boxes to facilitate spine cabling works.
This section of road is two lanes. The right hand lane is impeded by the hedges as you drop down after the bridge. This is no a safety item as cars are having to straddle the white line to avoid coming into contact with the hedges. Please can you trim them back before there is an accident.
clear blockage in f/w
laying 1m ducting in f/w then 20m in private
Minor remedial works
Private Works issued under Road Space Allocation Licence, carried out by Copenhagen Offshore Partners. Preparation and access for exploratory drilling for the Morecambe Offshire Windfarm Project. Exploratory drilling will be undertaken away from the highway within the dunes. Material and plant deliveries and decommissioning will be undertaken from the highway under traffic management.
channel sweep and grass cutting
laying 23m ducting in f/w
HAMBLETON V9009 - PON Gigabit 1420656 - Cable jointing and splicing to complete BT Spine works in Footway/Carriageway/Verge
3 POINT ROAD CLOSURE REQUIRE TO TEST TWO POLES. PERMIT LINKED WITH BC008WH4PD23F01PTSB, BC008WH4PD23F02PTSB
3 POINT ROAD CLOSURE REQUIRE TO TEST TWO POLES.
3 POINT ROAD CLOSURE REQUIRE TO TEST TWO POLES. PERMIT LINKED WITH BC008WH4PD23F01PTSB
Open cut excavation required to reset frame and cover in the carriageway
ROAD CLOSURE IS REQUIRED FOR SAFE ACCESS FIBRE CABLE JOINT AT JOINT BOX.
Mains Renewal - install new pipe, a hydrant and camera survey
Mains Renewal - install new pipe, a hydrant and camera survey
Open cut excavation required to reset sunken/defective frame and covers in the carriageway
ROAD CLOSURE REQUIRE TO TEST A POLE.
GANG TO REPLACE MANHOLE FRAME AND COVER IN CARRIAGEWAY WITH PERMANENT REINSTATEMENT
Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour.
REPLACEMENT OF EXISTING VODAFONE MOBILE MAST AND ASSOCIATED CIVILS & CABLING WORKS
UNINSTALLATION AND INSTALLATION OF TELEGRAPH POLE CARRYING FIBER CABLE
Install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
GARSTANG V27017 - PON Gigabit 1453107 - To build new 2 x JUF2 joint box and lay approx 122m of Duct 54/56 in
2 WAY LIGHTS IS REQUIRED FOR SAFE ACCESS FIBRE CABLE JOINT AT JOINT BOX.
Excavate joint bay with track in the footway to install and joint cable for new connection to car charging point located on private land.
Desilting and CCTV survey of the sewer network to prevent pollution.
to clear blockage
ROUTINE MAINTENANCE OF SEWER NETWORK ON BEHALF OF UNITED UTILITIES
Traffic management only to support the maintenance of overhead electrical cables. Temporary traffic controls will be implemented to ensure safe access for operatives and equipment during the works. No excavation will be undertaken as part of this activity. This permit is for coordination and notification purposes only.
MJ QUINN ARE TO UNDERTAKE HEAVY CABLE RECOVERY WORKS IN CARRIAGEWAY MOVING BOX TO BOX - MULTIPLE ROLLING TM SETUPS - NO EXCAVATION
NWGA270163 - Connection notice in relation to works on Preston Street
Gas mains connection
Open cut excavation required to replace leaking stop tap in the footway
Access required to connect duct to customers curtilage & clear a blockage nr the bt box in order to provide high speed broadband service
Private Works issued under Section 50 Licence, carried out by JT Northwest Ltd. Kerb, tactile paving and footpath replacement, repairs to a rocking BT chamber, and installation of bollards at the junction.
1x Short sided disconnection of old lead supply and replace with new water connection
Private Works issued under Section 50 Licence, carried out by Aim Utilities. Lay approximately 15m of new water connection for new care home development on Sandy Lane
Excavate joint bay in the footway to install and joint cable for new connection for heat pump located on private grounds.
Private Works issued under Road Space Allocation Licence, carried out by Tom Partridge. Jetting/CCTV Survey works taking place inside the manhole chambers located in the C/Way and Footway
Traffic management only to support the maintenance of overhead electrical cables. Temporary traffic controls will be implemented to ensure safe access for operatives and equipment during the works. No excavation will be undertaken as part of this activity. This permit is for coordination and notification purposes only.
Cabinet removal - Hiab
Private Works issued under Section 171 Licence, carried out by JNCivils LTD. Vehicle Crossing
2 WAY LIGHT WITH AB BORADS IS REQUIRED FOR LAYING DUCT
MJ QUINN ARE TO RECOVER REDUNDANT HEAVY TELECOMS CABLE FROM EXISITING CHAMBERS - NO EXCAVATION - ROLLING TM
Enabling new localised ultra-fast broadband connections. This activity involves excavation to install telecoms duct to provide service and reinstatement.
Install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
1x Short sided disconnection of old lead supply and replace with new water connection
Phase 2 - REPLACEMENT OF EXISTING VODAFONE MOBILE MAST AND ASSOCIATED CIVILS & CABLING WORKS
Private Works issued under Road Space Allocation Licence, carried out by Tom Partridge. Jetting/CCTV Survey works taking place inside the manhole chambers located in the C/Way and Footway
ROUTINE MAINTENANCE OF SEWER NETWORK ON BEHALF OF UNITED UTILITIES
Excavate joint bay in the footway to install and joint cable for new connection.
install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
Phase 2 - REPLACEMENT OF EXISTING VODAFONE MOBILE MAST AND ASSOCIATED CIVILS & CABLING WORKS
Excavation and Box Building to upgrade Fibre to local substation
Excavation in the footway and/or carriageway to replace existing electrical apparatus, and associated cables. Works involve removal of aged or damaged equipment, installation of new units, cable jointing, and testing. Once complete, the works will be backfilled & reinstated.
183m Track, tobys, 4 road crossings, 1 chamber
REPLACEMENT OF EXISTING VODAFONE MOBILE MAST AND ASSOCIATED CIVILS & CABLING WORKS
10MM PATCH 1.8 X 0.6, 6MM 1.8 X 0.8 AND 3X BULL NOSE EDGING KERBS
Open cut excavation required to rebuild defective chamber causing a potential hazard in the footway
remedial works to correct defect
NWGA270163 - connection notice in relation to works on Preston Street
194m track, tobys, 5 road crossings, 1 chamber
NWGA270172 - Replace 122m gas main with associated services and connections as directed by the HSE to maintain a safe gas network
Excavation and Box Building to upgrade Fibre to local substation
Overlay â Lay approx 15m of duct in FW to link existing BT boxes to facilitate spine cabling works.
Private Works issued under Section 171 Licence, carried out by JN Civils for a vehicle Crossing
Private Works issued under Section 50 Licence, carried out by Aim Utilities. Lay approximately 250m of new gas connection for new care home development on Sandy Lane
Excavate in footway for new service connection, Footway closure required,pedestrians to use dropped kerb ramps for diversion, grab use off peak after businesses shut under a 15 min delay.
Open cut excavation required to replace leaking service in the footway
Works requiring no excavation to facilitate the delivery and lifting of new electrical equipment, such as transformers, into an existing substation. Temporary traffic controls will be implemented to ensure safe access for lifting operations and vehicle movements.
1x Short sided disconnection of old lead supply and replace with new water connection
To install new BT duct from Pole situated in grass verge to new pole in private past Tudor Farm
Install 1 x 355mm End Connection to the 355mm PE Main
MJ QUINN ARE TO RECOVER REDUNDANT HEAVY TELECOMS CABLE FROM EXISITING CHAMBERS - NO EXCAVATION - ROLLING TM
Scarring on reinstatement. 6mm needs digging out and redoing to remove grab damage, 2m x 1.3m of 6mm needed,
Gas mains connection
Open cut excavation required to install stop tap in the footway
NWGA261383 - Replace 260m gas main with associated services and connections as directed by the HSE to maintain a safe gas network
Gas mains connection
Gas mains connection
Mains renewal of existing poor condition main
1x Long sided disconnection of old lead supply and replace with new water connection
Excavation in the footway and/or carriageway to replace existing electrical apparatus, and associated cables. Works involve removal of aged or damaged equipment, installation of new units, cable jointing, and testing. Once complete, the works will be backfilled & reinstated.
Incorrect materials, 10mm used where it should be 6mm. 1m x 0.5m of 6mm to be put down once 10mm is removed. Some C/W Incursion
Traffic management only to support the maintenance of overhead electrical cables. Temporary traffic controls will be implemented to ensure safe access for operatives and equipment during the works. No excavation will be undertaken as part of this activity. This permit is for coordination and notification purposes only.
GANG TO REPLACE MANHOLE FRAME AND COVER IN CARRIAGEWAY WITH PERMANENT REINSTATEMENT
Short sided disconnection of old lead supply and place new connection - L
Install 1 x 355mm End Connection to the 355mm PE Main
Excavate large joint bay (approximately 10m x 1.5m) to disconnect and remove old link box, and to install new underground link box following by jointing.
Complete camera and IR cabling
Private Works issued under Section 171 Licence, carried out by Chandos Civils. TEMPORARY WIDENING TO SITE ENTRANCE. DIG OUT GRASS VERGE, LOWER SURROUNDING KERBS, STONE up AREA AND TARMAC.
Install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
Gas mains connection
Traffic management only to support the maintenance of overhead electrical cables. Temporary traffic controls will be implemented to ensure safe access for operatives and equipment during the works. No excavation will be undertaken as part of this activity. This permit is for coordination and notification purposes only.
Overlay â Lay approx 1m of duct in FW to link existing BT boxes to facilitate spine cabling works.
Replace approx. 90m of gas mains & associated services
lay 20m of ducting in f/w
Install external water meter and boundary box at depth of under 1.5 meters with d minimum ig.
Install a flow monitor in chamber no excavation. Works to take no more than 2 hours.
2 WAY LIGHT WITH AB BORADS IS REQUIRED FOR LAYING DUCT
Excavation in adopted and private land to deloop existing looped electricity supplies to support low carbon technology e.g. car chargers, solar panels, heat pumps. This will include the disconnection of an old shared service cable & installation of new individual service cables to multiple properties. Works will involve excavating to identify the mains cable & shared cable, testing, laying new service cables, internal property upgrades and meter relocation, followed by backfill & reinstatement.
Install external water meter and boundary box at depth of under 1.5 meters with minimum dig.
Excavate joint bay with track in the footway to install and joint cable for new connection to car charging point located on private land.
MJ QUINN ARE TO RECOVER REDUNDANT HEAVY TELECOMS CABLE FROM EXISITING CHAMBERS - NO EXCAVATION - ROLLING TM
1x Short sided disconnection of old lead supply and replace with new water connection
Excavation in the footway and/or carriageway to replace existing electrical apparatus, and associated cables. Works involve removal of aged or damaged equipment, installation of new units, cable jointing, and testing. Once complete, the works will be backfilled & reinstated.
Private Works issued under Section 171 Licence, carried out by Chandos Civils. TEMPORARY WIDENING TO SITE ENTRANCE. DIG OUT GRASS VERGE, LOWER SURROUNDING KERBS, STONE up AREA AND TARMAC.